Comparing written radon mitigation bids

Radon mitigation system cost varies with the foundation, system design, access, electrical work, and testing. A&B Water Consultants' May 28, 2026 guide gives $1,200–$3,000 as a regional budget for straightforward sub-slab depressurization in New Hampshire, southern Maine, and Massachusetts, including fan, piping, sealing, and a post-installation test. It is not a bid for your home. Water treatment is a separate scope and is not included here.

What to check

Read the testing and warranty lines of a bid
Bid itemAsk the contractor to specify
Covered foundationWhich slabs, additions or crawl spaces each suction point serves, the proposed fan and where the exhaust terminates.
Installation and handoffWho handles electrical work, permits, sealing, labels and finish repairs. Ask for an installation date and written operating instructions.
Installer-arranged testTester, payer, start time, test length, report deadline and what happens if levels remain elevated.
Independent measurementName or qualifications of an independent tester, who books and pays, and when you receive the written report.
Warranty and corrective workEquipment and labor periods, performance target, transfer terms and who pays for further work and retesting.

Use the air test and foundation details

In a real estate transaction, EPA recommends fixing a home when the average from a continuous monitor used for at least 48 hours is 4 pCi/L or higher. With two short-term tests, use their average. A long-term result of 4 pCi/L or higher also warrants action. EPA advises considering mitigation between 2 and 4 pCi/L. Share the complete report and ask which foundation areas each proposed system covers. Radon in well water calls for a separate assessment and price.

Identify the equipment and work

Request the fan model, suction points, exhaust route, sealing, system monitor, electrical work, permits, and any finish repairs. EPA does not recommend sealing alone as a reliable radon reduction method. Ask the contractor to assess combustion-appliance backdrafting where relevant.

Book the follow-up measurement

EPA recommends checking the system within 30 days of installation. Start after it has run for at least 24 hours, with the fan on if fitted. Plan for a two- to seven-day measurement. Keep windows and exterior doors closed for 12 hours beforehand and during the test, except for normal entry and exit. If the installer tests its own work, EPA also recommends an independent follow-up measurement. Record who arranges and pays for each test and when each written result is due.

Compare guarantees and contractor qualifications

Check state licensing or certification requirements with the state radon office. Ask for proof of qualifications and insurance. Get written equipment and labor warranty terms, any radon-level performance guarantee and its duration, exclusions, corrective work and retesting charges, and whether coverage transfers to a buyer. Agree who obtains permits and pays for electrical and corrective work.

Compare radon mitigation quotes

Enter a bundle price once. For itemized quotes, leave the base blank and enter each charge on its row.

Give both contractors the same indoor-air results, foundation details, site access, desired completion date, and report deadline. Enter your actual written proposals; ask each to identify who performs and pays for its installation test and any separately arranged independent test. The regional range is one company's published budget, not two comparable bids.

How we compare quotes

Start with the quote

Enter one-time charges only. Enter 0 for an explicit $0 charge, and leave unpriced charges blank.

Quote A

Quote B

Foundation and areas covered

Describe each basement, slab, or crawlspace and identify the areas included in the proposed design.

Existing indoor-air test

Record the result in pCi/L, test location, dates, and report provided to both bidders.

Suction and exhaust route

List suction points, fan location, pipe route, and exhaust endpoint.

Installation and report deadlines

Record the agreed installation completion date and dates each post-installation test and report must be delivered.

Site assessment and diagnostics

Which inspection and diagnostic tests are included, and what is charged separately?

Quote A
Quote B

Suction system and fan

Which foundation areas, suction points, fan model, monitor, and materials are included?

Quote A
Quote B

Pipe, exhaust, and sealing

Where will piping and exhaust run, and which penetrations and openings will be sealed?

Quote A
Quote B

Electrical work

Is a new circuit or outlet needed, who performs it, and is it included?

Quote A
Quote B

Permits and inspections

Who obtains, schedules, and pays for applicable permits and inspections?

Quote A
Quote B

Installer-arranged post-install test

Who performs and pays for the test, when does it start, how long does it run, and when is the report due?

Quote A
Quote B

Independent post-install test

Is an independent qualified tester included or separately hired? Who pays, when will testing start and finish, and when will the report arrive?

Quote A
Quote B

Cleanup and finish repairs

Which disturbed surfaces, roof or wall penetrations, cleanup, and finish repairs are included?

Quote A
Quote B

Warranty and corrective work

What are the equipment and labor terms, performance target, duration, exclusions, transferability, and charges for adjustments and retesting?

Quote A
Quote B

Scope notes (optional)

Capture scope differences, recurring charges, and billing frequency.

Your entries stay in this browser tab.